SPECTRUM BUILDING

Project Description: Lancer Scott have completed two recent phases of work so far at the Spectrum building. The first phase included the full strip-out of all raised floors, ceilings, column encasements, perimeter trunking and all M& E equipment on the whole of the Ground floor which encompassed suites A-E. We then reinstated new ceilings, lighting, raised floors, all mechanical services including fresh air and treated 76no columns with a specialist Mapei product. We also installed new fire doors throughout and completed all decorations.

The second phase included the complete strip out including all existing ceilings in the large scale reception and lift lobby areas. We then installed new feature ceilings including ceiling fin detail and custom  spectacular LED lighting. We also replenished the existing traventine tile floor and removed the existing circular entrance doors and replaced them with new flat automatic entrance door. Full decorations and  furniture was installed including a stunning custom reception desk and custom glass feature wall, also illuminated by the changing LED lighting. All reception works were completed whilst the building was occupied and had heavy foot traffic throughout. We ensured all Health and Safety standards to both workers and members of the public/tenants and minimised disruption to tenants throughout the works.